Bozen/Bolzano–Meran/Merano: temporary closure of railway line

Maintenance work on Sunday, 12 October 2025

On Sunday, 12 October 2025, the Bolzano–Merano railway line will be temporarily closed from 7:30 a.m. to 1:30 p.m. for inspection and routine maintenance work scheduled by the infrastructure manager, RFI. 

Travel information: The SAD train will depart from Meran/Merano at 6:52 a.m., 20 minutes earlier than the usual timetable. From Bozen/Bolzano, however, the departure time remains unchanged.

 

Replacement bus service   

The following two replacement buses will serve the route during the rail service disruption:  

  • The B200 Express Bus departs from Bozen/Bolzano (platform B in G.-Garibaldi-Straße/via G. Garibaldi) and arrives directly in Meran/Merano (platform B, near the underpass), travelling via the MeBo without any intermediate stops. Standing room is not permitted as the bus is travelling on the highway.  
  • The replacement bus, the B200, runs along the Meran/Merano–Bozen/Bolzano railway line, stopping at all intermediate stations. Replacement buses do not serve the Bozen Süd/Bolzano Sud and Bozen Kaiserau/Bolzano Casanova stops. In Siebeneich/Settequerce, the replacement buses stop at the “Schule/Scuola” bus stop. In Gargazon/Gargazzone, the stop is called “Dorf/Paese”.

Replacement bus service - B200

 

The 201 Bozen/Bolzano-Meran/Merano bus service offers an additional travel alternative.

Bike transport – Not allowed on replacement buses.

Information for people with reduced mobility HERE.

 

Receive push notifications

Receive notifications for your preferred stops, routes and lines. These settings can be deactivated at any time in your browser.